The N54° containerized BESS unit. ~3.5 MWh. German-engineered. Deployable at scale.
A standardized, transport-ready battery container designed for rapid siting alongside grid infrastructure, data centers, and renewable generation.

A single unit, engineered for the full deployment lifecycle.
Each N54° container arrives complete: battery modules, integrated thermal management, fire safety, BMS, and internal switchgear interfaces — assembled and factory-tested in Rostock-Laage. Sites integrate at the AC boundary using components from established European power-distribution partners.
The result is a repeatable, bankable building block for grid and data-center projects — one that scales linearly from first pilot to gigawatt-hour portfolios.
Specifications are indicative and subject to configuration. Detailed datasheets available under NDA.
Grid-scale storage
Frequency regulation, capacity markets, arbitrage, and firming of renewables at transmission and distribution scale.
Data center resilience
Backup, peak shaving, and power-quality smoothing for hyperscale and colocation facilities under compute-driven load growth.
Renewable integration
Shifting solar and wind output to match demand, recovering curtailment, and enabling higher-utilization interconnections.